- Project Name Sewer Water Treatment Control Board
- Client #21
- Category Control Boards
- Date December 2021
- Duration 2 Weeks
- Location Nairobi, Kenya
About the Project
When designing a control board/panel, Cost is always important, but so is an attractive appearance, simple operator controls, and reliable operation.
Our client in Nairobi tasked us to design a Sewer Water Treatment Control Board and our skilled team didn’t disappoint.
At Nairobi controls, we design and build electrical control panels for different applications.