![Sewer Water Treatment Control Board](https://i0.wp.com/pidsystems.co.ke/wp-content/uploads/2022/02/Sewer-Water-Treatment-Control-Board.jpeg?fit=1280%2C960&ssl=1)
- Project Name Sewer Water Treatment Control Board
- Client #21
- Category Control Boards
- Date December 2021
- Duration 2 Weeks
- Location Nairobi, Kenya
About the Project
When designing a control board/panel, Cost is always important, but so is an attractive appearance, simple operator controls, and reliable operation.
Our client in Nairobi tasked us to design a Sewer Water Treatment Control Board and our skilled team didn’t disappoint.
At Nairobi controls, we design and build electrical control panels for different applications.