• Call: (254) 703 174 358

Sewer Water Treatment Control Board

  • Project Name Sewer Water Treatment Control Board
  • Client #21
  • Category Control Boards
  • Date December 2021
  • Duration 2 Weeks
  • Location Nairobi, Kenya

About the Project

When designing a control board/panel, Cost is always important, but so is an attractive appearance, simple operator controls, and reliable operation.

Our client in Nairobi tasked us to design a Sewer Water Treatment Control Board and our skilled team didn’t disappoint.

At Nairobi controls, we design and build electrical control panels for different applications.